At the start of the project’s design process, Streamline Architects utilizes three-dimensional modeling to conceptualize programming and schematic design with the client. The interactive design approach allows the client to become part of the design team. The bonding time created between the client and staff allows Streamline to extract the client’s intentions early on in the project’s life. Interactive design also enables the client to visualize the design before construction.